BUILDING HOPE'S GARDEN
 
1. The brush has been cleared. We hired someone to pull the tree stumps and grade the area, 1996. 2. This is the first attempt. We used old rugs and padding underlying the roofing EPDM. The sandy sides are beginning to cave in already.
3. The limestone pavers are set around the pond.  The sides are breaking down with the weight. The arbor is still just sticks. 4. The block work for the Goldfish 
pond is almost done, 1997. 
5. The Goldfish pond is padded and
ready for the liner.
6. The Goldfish pond is done and filled.